How to Reduce the Amount of Time to Fix DRCs Near Tapeout?

Tech Talks from the Leaderboard

In the later stages of design cycle, it is important to identify and fix DRC issues quickly to meet the tapeout schedule. This video discusses some techniques and best practices. Taking advantage of the integration of IC Compiler II with signoff quality IC Validator DRC checking, designers can automatically fix DRC violations and improve turnaround time by automatically detecting changed ECO areas for incremental DRC checking.